实验室装修设计布局要做好的6件事

来源:http://www.sdrunjing.com/ 日期:2020-05-26 发布人:润静小编
  你们知道么,试验室规划布局要做好6件事,即:平面规划、单台结构功用规划、给排水体系规划、电控体系规划、送风体系规划、排风体系规划。
  Do you know that there are six things to do well in the planning and layout of the laboratory: plane planning, single structure function planning, water supply and drainage system planning, electric control system planning, air supply system planning and exhaust system planning.
  1.平面规划
  1. Plane planning
  试验室规划的首要问题是安全性,这点在平面规划中尤为重要,因此有必要确保试验室内的通风流通、逃生通道畅通。试验室内的天平台与仪器台离墙要有40cm的间距,试验台过道有必要通向走廊,以便发生事端后的人员分散。
  山东实验室装修设计
  The primary problem of laboratory planning is safety, which is particularly important in the  plane planning. Therefore, it is necessary to ensure the ventilation and circulation of the laboratory and the smooth escape passage. The space between the roof platform and the instrument platform in the laboratory shall be 40cm away from the wall. It is necessary for the aisle of the test platform to lead to the corridor so as to disperse the personnel after the accident.
  2.单台结构功用规划
  2. Function planning of single structure
  在试验室规划阶段,单台结构功用可分为3部分进行,即:试验台、仪器台、功用柜。其中,试验台分为物理试验台、化学试验台、生物试验台3类。仪器台用于仪器分析试验室,其承重需求达到500Kg以上。功用柜有全木、钢木2种,其主要作用是服务、储存,主要功用是涉及安全、环保等问题。
  In the stage of laboratory planning, the function of single structure can be divided into three parts: test-bed, instrument platform and function cabinet. Among them, the test-bed is divided into physical test-bed, chemical test-bed and biological test-bed. The instrument platform is used in the instrument analysis laboratory, and its load-bearing demand is more than 500kg. There are two kinds of functional cabinets: full wood and steel wood. Their main functions are service and storage. Their main functions are related to safety, environmental protection and other issues.
  3.给排水体系规划
  3. Water supply and drainage system planning
  因为给水与排水的性质不同,试验室的给排水体系大致分为2类,即:试验给排水、日常给排水,其排水管道也各自独立。
  Because of the different nature of water supply and drainage, the water supply and drainage system in the laboratory can be roughly divided into two categories, namely: test water supply and drainage, daily water supply and drainage, and their drainage pipes are also independent.
  进行试验室规划时,试验室给排水的供水水嘴为急流水嘴、缓流水嘴,排水则是废水排入废水处理站,经过处理后排入城市管网。日常给排水的供水水嘴参阅民用建筑,排水则是废水直接排入乡镇日子污水管网。
  When planning the laboratory, the water supply nozzles of the laboratory water supply and drainage are quick flow nozzles and slow flow nozzles, and the drainage water is discharged into the wastewater treatment station and then into the urban pipe network after treatment. The water supply nozzle of daily water supply and drainage refers to the civil buildings, and the drainage is the direct discharge of wastewater into the daily sewage pipe network of villages and towns.
  4.电控体系规划
  4. Electric control system planning
  这是试验室的基本体系之一,通常用电分为2部分,即:照明电、动力电。其中,照明电用于试验室内的照明,动力电用于各类仪器设备用电、电梯、空调等的电力供应。
  This is one of the basic systems of the laboratory. Generally, the electricity is divided into two parts, i.e. lighting electricity and power electricity. Among them, lighting electricity is used for lighting in the laboratory, and power electricity is used for power supply of various instruments and equipment, elevators, air conditioners, etc.
  试验室内的电源要沟通、直流兼备,插座也要单相、三相兼备,设有漏电维护开关、过载维护开关,且还有稳压要求。假如内设仪器分析试验室,还要有防电磁搅扰,接地和电磁。
  The power supply in the test room shall be connected and provided with both direct current and single-phase and three-phase sockets. Leakage maintenance switch and overload maintenance switch shall be provided, and voltage stabilization requirements shall be met. If the instrument analysis laboratory is built in, anti electromagnetic disturbance, grounding and electromagnetism shall be provided.
  5.送风体系规划
  5. Air supply system planning
  试验项目需求运用的气体有4种,即:不燃气体、惰性气体(氩气与氦气等)、易燃气体、助燃气体。这些气体经过输气管进入试验室,所以管线有必要密封。
  There are four kinds of gas required for the test project, namely: non combustible gas, inert gas (argon and helium, etc.), flammable gas and combustion supporting gas. These gases enter the laboratory through the gas pipeline, so it is necessary to seal the pipeline.
  6.排风体系规划
  6. Exhaust system planning
  试验项目有或许发生有害气体,因此排风至关重要。试验室规划的排风体系规划既要安全,又要节能。具体来说,排风设备包含:通风柜、原子吸收罩、万向排气罩、吸顶式排气罩、台上式排气罩等。
  There may be harmful gases in the test project, so exhaust is very important. The exhaust system planning of the laboratory should be safe and energy-saving. Specifically, the exhaust equipment includes: ventilation cabinet, atomic absorption hood, universal exhaust hood, ceiling exhaust hood, bench exhaust hood, etc.